The Legacy Magnet Academy
Tustin, CA
Home
/
Projects
/
The Legacy Magnet Academy
PROJECT LEADER
COMPLETION DATE
October 29, 2020
CLIENT
PJHM Architects, Inc.
PROJECT TYPE
K-12

This brand new 120,000 square-foot cutting-edge educational concept space provides students with refuge to study, collaborate, and recreate for both middle and high school students. Seamless integration of outdoor learning area with indoor study create unconfined classrooms produces a highly efficient use of programmed space. reducing the non-educational area such as corridors and foyers. Elevated pedestrian walkway interconnects all buildings and serves as an easily identifiable pathway and sense of direction. tk1sc provided electrical, low voltage, lighting, fire alarm, and audio-visual services.

PROJECT TEAM:
Jeremy Windle
Images Courtesy of
Brad Nelson
Previous Image Button
Next Image Button
No items found.
PROJECT LEADER
COMPLETION DATE
October 29, 2020
CLIENT
PJHM Architects, Inc.
PROJECT TYPE
K-12

This brand new 120,000 square-foot cutting-edge educational concept space provides students with refuge to study, collaborate, and recreate for both middle and high school students. Seamless integration of outdoor learning area with indoor study create unconfined classrooms produces a highly efficient use of programmed space. reducing the non-educational area such as corridors and foyers. Elevated pedestrian walkway interconnects all buildings and serves as an easily identifiable pathway and sense of direction. tk1sc provided electrical, low voltage, lighting, fire alarm, and audio-visual services.

PROJECT TEAM:
Images Courtesy of
Brad Nelson
Previous Image Button
Next Image Button
No items found.
The Legacy Magnet Academy
Tustin, CA
Home
/
Projects
/
The Legacy Magnet Academy
PROJECT LEADER
COMPLETION DATE
October 29, 2020
CLIENT
PJHM Architects, Inc.
PROJECT TYPE
K-12

This brand new 120,000 square-foot cutting-edge educational concept space provides students with refuge to study, collaborate, and recreate for both middle and high school students. Seamless integration of outdoor learning area with indoor study create unconfined classrooms produces a highly efficient use of programmed space. reducing the non-educational area such as corridors and foyers. Elevated pedestrian walkway interconnects all buildings and serves as an easily identifiable pathway and sense of direction. tk1sc provided electrical, low voltage, lighting, fire alarm, and audio-visual services.

PROJECT TEAM:
Jeremy Windle
tk1sc Project

The Legacy Magnet Academy

Client

PJHM Architects, Inc.
Location
Tustin, CA

This brand new 120,000 square-foot cutting-edge educational concept space provides students with refuge to study, collaborate, and recreate for both middle and high school students. Seamless integration of outdoor learning area with indoor study create unconfined classrooms produces a highly efficient use of programmed space. reducing the non-educational area such as corridors and foyers. Elevated pedestrian walkway interconnects all buildings and serves as an easily identifiable pathway and sense of direction. tk1sc provided electrical, low voltage, lighting, fire alarm, and audio-visual services.

Our Services

What we did.

Walkthrough Video

Heading

This is some text inside of a div block.
Irvine, CA

200 + 400 Spectrum Center Drive

Commercial Office
Santa Ana, CA

Bowers Museum

Arts + Exhibits
El Segundo, CA

Wiseburn High School

K-12